设施 Heating and Cooling Operating Procedure 217.08
哪个app可以赌足球
Series: 200 Administrative Services
第一部分:设施和财产

交叉引用: 设施使用政策217.01

适用性: This Operating Procedure applies to all 哪个app可以赌足球 (“赌钱app可以微信提现” or the “College”) interior spaces managed and operated by 赌钱app可以微信提现 unless specifically exempted by the Associate Vice 总统 of Campus Services and Facility Planning.

目的:  The purpose of this Operating Procedure is to prescribe temperature set points for the College that balance responsible stewardship of energy usage with the need for comfortable learning and working environments and are consistent with industry standards, describe how Campus Services will respond to concerns about building temperature, and specify rules for use of additional heating and cooling appliances.

I. 建筑物温度设定点:

The College has established a four-degree temperature range between heating and cooling temperature set points. 赌钱app可以微信提现’s established temperature set points are to be no warmer than 70 degrees for heating and no cooler than 74 degrees for cooling during occupied periods.

All 赌钱app可以微信提现 spaces will be maintained as close to these set points as possible during occupied periods. 然而, due to the age of some of the heating and cooling systems at 赌钱app可以微信提现 and the inability to control temperatures in some individual spaces, temperatures within two degrees on either side of the set points generally will be considered within the acceptable range. 

II. 服务请求:

If a building occupant believes the temperature in a work area is below 70 degrees in the heating season 或以上 74 degrees in the cooling season (± 2 degrees), the building occupant should contact Campus Services by calling ext. 3710 or by entering a work request in the 在线请求系统. 校园服务将:

  1. Measure the temperature within the room in question using digital thermometers that provide immediate air temperature read-outs.
  2. If the temperature is within the range prescribed by this Operating Procedure, Campus Services will not alter mechanical systems in the space or building, but they may seek ways to provider greater comfort, 与草案有关, 等.
  3. If the temperature is outside the range prescribed by this Operating Procedure, Campus Services will make every reasonable effort to correct the problem.
  4. 临时措施, such as electrical fans or approved heaters, may be provided by Campus Services to manage the environment until the approved temperature set points can be achieved.

3。. 使用认可电器:

If temperature set points are within the acceptable range under this Operating Procedure, 赌钱app可以微信提现 will not provide additional heating and cooling appliances. Employees may use their own funds to purchase and use the following approved appliances: (1) energy efficient pedestal or table top fans, or (2) oil filled radiant type electric heaters as approved by Campus Services. Employees must turn off all appliances at the end of the work day.

Typical electric resistance space heaters will not be permitted. These heaters can be a fire hazard, can adversely affect temperature control in adjacent areas and can overload circuits causing breakers to trip. 赌钱app可以微信提现 reserves the right to remove any non-approved appliances and hold them in storage for the owner to claim and take home.

IV. 例外: Exceptions to this Operating Procedure may be authorized by Associate Vice 总统 of Campus Services and Facility Planning, 或以上, based on documented circumstances (e.g., laboratory spaces with specific climate control requirements).                                              

Signature on File in Policy Office
总统


通过日期:08/19/2014
修正:04/20/2023